Drivers Urged to Avoid I-5 in Olympia Over Sept. 12 and 19 Weekends

The intersection of I-5 and US 101 is the site for the bridge expansion joint repair project planned for the weekends of Sept. 12 and 19.
0 Shares

 

Submitted by the Port of Olympia

The intersection of I-5 and US 101 is the site for the bridge  expansion joint repair project planned for the weekends of  Sept. 12 and 19.
The intersection of I-5 and US 101 is the site for the bridge expansion join repair project planned for the weekends of September 12 and 19.

Washington Dept. of Transportation (WSDOT) strongly urges drivers to avoid Interstate 5 near Capitol Lake over the weekends of September 12 and September 19.

The busy I-5/US 101 interchange in Olympia will be the focus of vital bridge structural repair work on those dates, day and night. In addition, preparations for the two weekends’ work will require lane and ramp closures on Thursday nights, Sept. 11 and Sept. 18.

WSDOT traffic engineers warn that drivers likely will face lengthy backups and delays because no convenient alternate state routes are available. Even with traffic volumes decreasing by 30% over the two weekends, traffic models show backups reaching 14 miles, with especially heavy congestion expected on southbound I-5.

Drivers who cannot avoid I-5 in Olympia at these times are advised to:

  • Consider traveling through the area before 10 a.m. or after 8 p.m.
  • Stay informed by checking WSDOT traffic alerts webpage, following WSDOT’s regional Twitter account and calling 5-1-1.
  • Expect considerable delays with miles of stop-and-go traffic.
  • Be prepared: Have a full tank of gas, have diversionary games for children traveling in the car, and pack patience.
  • Allow plenty of extra time to reach travel destinations.

Note: Construction work is weather dependent. For current information click here.

 

Print Friendly, PDF & Email
0 Shares